A home floor plan drawn in light lines, with bedrooms, kitchen and living room labelled
Concept · plan study from the Djibouti vision film
Home / Our approach

Our approach

From the first brief
to the life of the home.

Our eight stages cover planning, construction, handover and maintenance.

01 /Introduction

From planning to maintenance

We organize housing development into eight stages. This gives designers, suppliers and site teams a shared plan and keeps ownership and maintenance in view from the start.

The delivery pathway

Assembly loop · select a stage to hold the view. Concept only.

01 · Concept

01 /

Concept — Define the housing need

Start with the people the development is intended to serve. Understand the site, the housing brief, the available budget and the constraints that could affect delivery. A useful concept gives the design team a clear problem to solve.

02 /

Design — Turn the brief into a buildable proposal

Coordinate the home layout, site arrangement and construction approach. Consider local requirements, climate, household routines and the practical demands of installation. Design decisions should be checked against the project's scope and cost plan.

03 /

Manufacturing — Plan consistent components

Translate the approved design into a component and production plan. Specifications, quantities, inspection requirements and responsibilities need to be clear before production begins. The selected supplier and system form part of the project-specific delivery arrangement.

04 /

Logistics — Connect production to the site

Plan how components will be packed, transported, received and stored. Delivery order matters: materials should reach a prepared site in a sequence that supports installation and protects them from damage.

05 /

Installation — Assemble and inspect

Coordinate site readiness, trained installation teams and the required equipment. Assembly needs defined methods, inspections and records, with responsibility for connections, finishes and services agreed in advance.

06 /

Community — Prepare the place for daily life

Bring the homes together with the access and services that support occupation. Roads, water, drainage, power, waste arrangements and shared spaces need a coordinated plan with the responsible parties.

07 /

Ownership — Clarify the route to occupation

Establish how eligible households will enter the development and what conditions apply. Tenure, total cost, payments, documentation and handover should be clear for the particular project before any offer is made.

08 /

Maintenance — Plan for care over time

Identify the tasks and responsibilities that keep the homes and neighbourhood functioning. Materials, access for repair, resident information and service arrangements should be considered before handover.

The pathway in pictures

From the plan
to the plot.

Four of the eight stages, shown in the company’s own visualisations: the neighbourhood plan, the house design, components on the road and modules set in place.

Concept visualisations from the company’s films and Atbara presentation. They illustrate the stages; they don’t record a delivered project.

03 /Project controls

Clear handovers between teams

Designers need an agreed brief. Suppliers need approved specifications and quantities. Site teams need a delivery sequence and inspection plan.

We define the approvals, checks and responsibilities for each stage so the next team has what it needs.

Brief→Design→Production plan→Inspection record→Care information
04 /Local adaptation

Design for the location

Orientation, shade, ventilation, rainfall and ground conditions affect both comfort and cost. Available water, drainage and power also shape the plan.

We consider household routines alongside these site requirements, including privacy, cooking, storage and outdoor space.

Explore the construction sequence

Continue the conversation

Tell us what the project needs to achieve.

Discuss a project
AL-MUBARK

Building Homes.
Creating Better Lives.