Prefabrication

Better coordinated.
Carefully assembled.

Understand how offsite production and prepared sites can work together, and what each project still needs to resolve.

01 /Introduction

How prefabrication works

Prefabricated building elements are made before they reach the site, then assembled into the home. The amount of offsite work depends on the chosen system.

We plan production, transport and installation together. Approved designs and a prepared site are essential to making that sequence work.

02 /Factory and site

Prepare the site while components are made

Where the schedule allows, production and groundwork can run at the same time. Foundations, access, storage and lifting equipment must be ready when components arrive.

The production and site teams work to the same drawings, delivery dates and inspection requirements.

Production

Design & specification

Components & checks

Dispatch plan

Site

Surveys & approvals

Groundwork & services

Readiness checks

Coordinated installation ↓
Labelled cutaway of a home showing the steel frame, roof trusses and wall panels
Concept · Djibouti housing vision film

Potential benefits

What a coordinated
approach can improve.

01 /

Speed

Prepare the site while components are produced. The complete schedule still includes design, approvals, transport and inspections.

02 /

Consistency

Use coordinated specifications and repeatable production steps to support an agreed standard across homes.

03 /

Cost planning

Define quantities and scope early. Include site work, transport, services and finishes in the complete cost.

04 /

Quality control

Plan checks in production and on site, including connections, weatherproofing and completed work.

05 /

Scalability

Review an approved design and delivery method before repeating it across suitable phases.

06 /

Material use

Plan cutting, ordering and handling to reduce avoidable waste. Measure the actual result.

A closer look at the process

See the sequence.
Understand the connections.

Watch the construction sequence unfold, from site readiness to an assembled building. The film repeats automatically; choose a stage to take a closer look.

Muted film · continuous loopChoose a stage to explore ↓
01 / 04
0:00 / 1:47

A prepared site establishes the dimensions, levels and access the installation will depend on.

RAD Technology · External modular medical-facility animation, used as a design and process reference. Al-Mubark's housing system and project specification require separate confirmation.

04 /Performance

Specify the whole building

Walls, roofs, windows, insulation and connections must work together. We assess the selected system against local structural, fire, weather and comfort requirements.

The project specification sets the materials, installation methods and checks for the completed home.

Frame, panels and rooms · Djibouti housing vision film (concept). The company’s actual building system still needs technical confirmation.
05 /Questions about prefab

Questions about prefabrication

Does prefabricated mean temporary?

No. Prefabricated elements can form part of buildings intended for permanent use. The intended use, engineered design and local approvals determine what is suitable for a particular project.

Are all prefab homes made in the same way?

No. Some systems use flat panels; others use larger three-dimensional units or precast elements. Materials and assembly details vary. The selected project system should be explained before construction or sale commitments are made.

Can a home be adapted to a hot climate?

Climate should shape the design brief. Orientation, shade, roof design, ventilation, glazing and insulation can all affect comfort. Specific performance claims need calculations and evidence for the proposed building.

Does a quicker assembly mean the entire project is quicker?

Assembly is one part of the program. Surveying, design, permissions, production, freight, site preparation, utilities and inspections also take time. A project schedule needs to account for the whole sequence.

What should a project quotation explain?

It should identify the design and specification, what is included, the responsibilities of each party and any exclusions. Land, foundations, transport, services, finishes, approvals and applicable charges need to be addressed clearly.